1 Proposed Construction & Completion Of Elevated Reservoir And Ancillary Works For Industrial Zone Phase 4, Kulim Hi-Tech Park, Kedah.(Civil & Structure Works) Kulim Technology Park Corporation S/B (KTPC) Kumpulan Liziz S/B. RM3,630,000.00 2013-2014 Completed
2 Mass Rapid Transit Lembah Klang - Jajaran Sungai Buloh - Kajang. Works For Station Box, Vent Building & Entrance Box At Pasar Rakyat Underground Station.( Civil & Structure works.) MMC Gamuda JV SP Mega S/B. RM 6850,000.00 2014-2016 Completed
3 Cadangan Merekabentuk, Membina Dan Menyiapkan Projek Perumahan Rakyat 1 Malaysia (PR1MA) Yang Mengandungi 231 Unit Rumah Teres Setingkat Dan Kemudahan Lain Yang Berkaitan Di Atas Lot 8070 MK Padang Siding, Arau, Perlis. PR1MA Mega Sasa S/B. RM21,500,000.00 2016-2018 Completed
4 Cadangan Pembinaan Fakulti Teknologi Kejuruteraan (FTK) Di Universiti Teknikal Malaysia Melaka (UTEM), Hang Tuah Jaya, Durian Tinggal, Melaka. UTEM/ JKR Mega Sasa S/B. RM21,300,000.00 2016-2018 Completed
5 Cadangan Membina Skim Perumahan Bercampur Di Atas Lot 8695, Mukim Gerik, Daerah Hulu Perak, Perak. Asia BinaIdaman S/B SPK Asas S/B RM3,080,000.00 2017-2018 Completed
6 Cadangan Pembangunan Bercampur Bagi Fasa 1 (Plot 3) Yang Mengandungi 93 Unit Kedai 3 & 4 Tingkat, I Blok Hotel Bajet 5 Tingkat (102 Bilik) Dan 5 Unit Kedai Di Tingkat Bawah Di Atas Lot 5929, Lebuhraya Bandar Cassia, Batu Kawan, Mukim 13, Seberang Perai Selatan, Pulau Pinang.- ASPEN VISION CITY -. Aspen Vision City S/B Daya CMT S/B. RM15,668,727.25 2017 – 2018 Completed
7 Pembinaan Sekolah Daif Menggunakan Kaedah IBS Di Semenanjung Malaysia Untuk Projek Pembinaan: 1) 4 Bilik Darjah SMK Kuala Pegang, Baling, Kedah. 2) 4 Bilik Darjah SK Penghulu Abu Bakar Baling, Kedah. 3) 6 Bilik Darjah SK Kampong Kota Bukit, Sik Kedah. Untuk Tetuan Kementerian Pendidikan Malaysia. Kemeterian Pendidikan Malaysia Innokoperat S/B RM2,142,000.00 2018 Completed
8 Proposed 1 Unit 3 Storey Bungalow At Lot 10 Bakar Bata, Alor Setar Kedah. Fast Tech Builders Sdn Bhd RM2, 600,000.00 2019 Completed
9 Cadangan Meroboh Dan Membina Semula Rumah Tamu 4 Tingkat (60 Bilik), Dan Sebuah Pencawang Elektrik Di Atas Lot 4050, Sebahagian Lot 4049 Dan 4492, Jalan Denai Intan, Mukim Durian Sebatang, Daerah Hilir Perak, Teluk Intan, Perak Darul Ridzuan.. PERAK CORPERATION Edifice Builders Sdn. Bhd RM4,962,845.00 2018-2019 Completed
10 Pembinaan Mahkamah Baharu Kangar, Perlis. JKR SPK Asas Sdn Bhd RM3,129,073.40 2018-2020 Completed
11 Menaiktaraf Sekolah Menengah Vokasional Kulim Kepada Kolej Vokasional Kulim, Kedah Darul Aman... Kementerian Pendidikan Malaysia Vertice Construction Sdn. Bhd. RM8,964,178.67 2019 – 2020 Completed
12 Cadangan 434 Unit Rumah Teres 20' X 70' dan 679 Unit Rumah Teres 22' X 66' bagi Fasa 1 dan Fasa 2 di atas Sebahagian Lot 16, mukim Gurun, Daerah Kuala Muda, Kedah Darul Aman Isaga Utara Sdn Bhd Fast Tech Builders Sdn Bhd RM27,598,000.00 15/3/2020-15/4/2022 (COMPLETED)
13 Projek Inokom - Flood Mitigation & BMW Wall Demolish (Drainage Upgrading) Sime Darby Berhad Fast Tech Builders Sdn Bhd RM703,500.00 August 2020 Completed
14 Projek Inokom – Cadangan Membina dan Menyiapkan : (1) Tempat Letak Kereta Terbuka (CBU AREA) Diatas Sebahagian PT440, (2) Tempat Letak Kereta Berbumbung (PDI AREA) Serta Kemudahan Berkaitan Diatas Sebahagian PT 439 (LOT LAMA 38) Mukim Padang Meha, Daerah Kulim, Kedah Darul Aman. Sime Darby Berhad Fast Tech Builders Sdn Bhd RM5,880,000.00 January – May 2021 Completed
15 Cadangan Membina dan Menyiapkan: 1) Zone A1 dan A2-Tempat Letak Kereta dan Tempat Letak Motosikal Berbumbung di atas Sebahagian dan PT439 dan PT440, 2) Zone B-Tempat Letak Kereta Terbuka dan Tempat Letak Kereta Berbumbung di atas Sebahagian PT439, 3)-Laluan Pejalan Kaki Berbumbung di atas Sebahagian PT439 dan PT440, Mukim Padang Meha, Daerah Kulim, Kedah Inokom Corparation Sdn Bhd Fast Tech Builders Sdn Bhd RM 6,775,000.00 October 2021 – March 2022 (COMPLETED)
16 Cadangan Membina dan Menyiapkan: 1) Zone A1 dan A2-Tempat Letak Kereta dan Tempat Letak Motosikal Berbumbung di atas Sebahagian dan PT439 dan PT440, 2) Zone B-Tempat Letak Kereta Terbuka dan Tempat Letak Kereta Berbumbung di atas Sebahagian PT439, 3)-Laluan Pejalan Kaki Berbumbung di atas Sebahagian PT439 dan PT440, Mukim Padang Meha, Daerah Kulim, Kedah Inokom Corparation Sdn Bhd Fast Tech Builders Sdn Bhd RM2,520,415.60 1 July 2023 – 31 October 2023 (COMPLETED)
17 Cadangan Membina dan Menyiapkan: 1) Zone A1 dan A2-Tempat Letak Kereta dan Tempat Letak Motosikal Berbumbung di atas Sebahagian dan PT439 dan PT440, 2) Zone B-Tempat Letak Kereta Terbuka dan Tempat Letak Kereta Berbumbung di atas Sebahagian PT439, 3)-Laluan Pejalan Kaki Berbumbung di atas Sebahagian PT439 dan PT440, Mukim Padang Meha, Daerah Kulim, Kedah Inokom Corparation Sdn Bhd Fast Tech Builders Sdn Bhd RM 7,950,000.00 1 July 2023 – 27 December 2023 (COMPLETED)
18 Cadangan Membina dan Menyiapkan: (1) 1 Unit Kilang Mengecat Kereta Tertutup 2 Tingkat (PS3) (2) 1 Unit Loji Rawatan Sisa Cecair Berbumbung (3) 2 Unit Tambahan dan Pindaan Gudang Simpanan Tertutup 1 Tingkat (WBS & PBS) (4) 2 Unit Transfer Tunnel Tertutup di atas sebahagian PT 439, Mukim Padang Meha, Daerah Kulim Kedah. Untuk Tetuan Inokom Corporation Sdn Bhd Inokom Corparation Sdn Bhd Fast Tech Builders Sdn Bhd RM 60,634,214.29 1 April 2022 – January 2024 (COMPLETED)